Home>Reconstruction from 2011 tsunami
Reconstruction from 2011 tsunami
We have been building a better and more resilient future for communities affected by the March 2011 earthquake/tsunami, based on Kokusai Kogyo’s social infrastructure development experience.
Level |
National/Regional Level |
Local Level |
Disaster risk reduction |
- -3D laser surveying (DMC, LP)
- -Various simulations, ocean short-wave radar
- -Emergency communication systems DRR education
- -Slope/dam monitoring/management
- 3D laser scanning (tunnel)
|
- -Property tax/cadastral surveys
- -GIS to manage. waterworks, sewage, road register
- -Hazard maps, DRR planning
- -Spatial information, surveying data archive sales
- Geographic information system (GIS)
|
|
|
Immediate aftermath |
- -Aerial photography (nadir, oblique), Photo interpretation/analysis
- -Detailed tsunami field surveys, CG tsunami simulations ? rapid inundation analysis
- Aerial photo by Kokusai Kogyo, Rikuzentakata City
|
- -Local survey research
- -Local govt. administrative support
- -Survey of collapsed/washed away houses
- Local survey research
|
|
|
Recovery |
- -Detailed disaster surveys, reconstruction planning
- -Making maps for reconstruction planning
- -Disaster waste surveys, making disposal plans
- -Detailed disaster surveys, reconstruction planning
- Waste disposal plan
|
- -Survey of collapsed/washed away houses
- -Management of house demolishing
- -Waste surveys/developing waste disposal plans
- -Supporting integration/use/evaluation of administrative data
- -Developing/managing geographic information systems (GIS)
- -Assisting community consensus building for reconstruction utilizing 3D simulations
- -Provision/sale of tsunami simulation/survey/map data
- Disaster debris analysis
|
|
|
Reconstruction |
- -Road, bridge, port etc. survey/design
- -Liquefaction/slope stabilization countermeasures
- -Radiation surveys/decontamination planning
- -Survey, design, construction of renewable energy
- -Recovery of industry (creating jobs for those affected)
- Bridge survey/design
|
- -Urban reconstruction plans (DRR/land use/urban plans)
- -Development of basic urban infrastructure (land readjustment/victim relocation projects)
- -Administrative support
- -Development of integrated databases for reconstruction
- -Renewable energy adoption for emergency power backup
- -Eco town projects
- Eco town
|
Rebuilding for a New Future
Great East Japan Earthquake Archives Disaster on March 11, 2011